-40%

Norfolk Southern Operating Rules, System Timetable, etc.; January 1, 2012

$ 10.56

Availability: 100 in stock
  • Year: 2012
  • Modified Item: No
  • All returns accepted: ReturnsNotAccepted
  • Condition: New
  • Country/Region of Manufacture: United States

    Description

    Package contains five separate  sections that include: Norfolk Southern Operating Rules, System Timetable, Safety and General Conduct Rules, Equipment Operation and Handling Instructions and Hazardous Materials Instructions; effective January 1, 2012. Condition is "New"; still wrapped in cellophane package. Softcover, 8-1/2" x 5-1/2". Shipped to continental US via USPS Media Mail.